Plant Status of Fukushima Daiichi Nuclear Power Station
-
Communiqué de presse de TEPCO, l'exploitant japonais des centrales de Fukushima, le 13 mars à 2h du matin heure locale :
All 6 units of Fukushima Daiichi Nuclear Power Station have been shut down.
Unit 1(Shut down)
- Reactor has been shut down. However, the unit is under inspection due to
the explosive sound and white smoke that was confirmed after the big
quake occurred at 3:36PM.
- We have been injecting sea water and boric acid which absorbs neutron
into the reactor core.
Unit 2(Shut down)
- Reactor and Reactor Core Isolation Cooling System have been shut down.
Current reactor water level is lower than normal level, but the water
level is steady. After fully securing safety, we are preparing to
implement a measure to reduce the pressure of the reactor containment
vessels under the instruction of the national government.
Unit 3(Shut down)
- Reactor has been shut down and we continue injecting water by High
Pressure Core Injection System. After fully securing safety, we are
preparing to implement a measure to reduce the pressure of the reactor
containment vessels under the instruction of the national government.
- Currently, we do not believe there is any reactor coolant leakage
inside the reactor containment vessel.
Unit 4 (shut down due to regular inspection)
- Reactor has been shut down and sufficient level of reactor coolant to
ensure safety is maintained.
- Currently, we do not believe there is any reactor coolant leakage inside
the reactor containment vessel.
Unit 5 (outage due to regular inspection)
- Reactor has been shut down and sufficient level of reactor coolant to
ensure safety is maintained.
- Currently, we do not believe there is any reactor coolant leakage inside
the reactor containment vessel.
Unit 6 (outage due to regular inspection)
- Reactor has been shut down and sufficient level of reactor coolant to
ensure safety is maintained.
- Currently, we do not believe there is any reactor coolant leakage
inside the reactor containment vessel.
Casualty
- 2 workers of cooperative firm were injured at the occurrence of the
earthquake, and were transported to the hospital.
- 1 TEPCO employee who was not able to stand by his own with his hand
holding left chest was transported to the hospital by an ambulance.
- 1 subcontract worker at important earthquake-proof building was
unconscious and transported to the hospital by an ambulance.
- The radiation exposure of 1 TEPCO employee, who was working inside the
reactor building, exceeded 100mSv and was transported to the hospital.
- 4 workers were injured and transported to the hospital after explosive
sound and white smoke were confirmed around the Unit 1.
- Presence of 2 TEPCO employees at the site are not confirmed
Others
- We measured radioactive materials inside of the nuclear power station
area (outdoor) by monitoring car and confirmed that radioactive
materials level is higher than ordinary level. Also, the level at
monitoring post is higher than ordinary level. We will continue to
monitor in detail the possibility of radioactive material being
discharged from exhaust stack or discharge canal. The national
government has instructed evacuation for those local residents within
20km radius of the periphery because it's possible that radioactive
materials are discharged.
- We will continue to take all measures to restore the security of
the site and to monitor the environment of the site periphery.
Pour être informé des derniers articles, inscrivez vous :